女女互吃奶互摸视频,很很鲁在线视频,2022国产三级在线播放,3344视频网,亚色-全新,在线a免费观看最新网站

您好,歡迎訪問濟(jì)南慶飛機(jī)械設(shè)備有限公司官網(wǎng) 網(wǎng)站

全國咨詢熱線:

15621892888
15550061228

當(dāng)前位置:首頁>新聞資訊>行業(yè)動態(tài)移動式登車橋要怎么操作?

移動式登車橋要怎么操作?

文章出處:http://shyulang.cn/ 人氣: 0 發(fā)表時間:2022-12-21
移動式登車橋裝卸貨起來是非常好用的一款設(shè)備,本身有一定的坡度,起到了橋梁的作用。別看移動式登車橋的體積較大,其實(shí)它是相當(dāng)簡單的工具,操作起來也不會那么復(fù)雜,一起來看看移動式登車橋要怎么操作?
The mobile boarding bridge is a very useful equipment for loading and unloading. It has a certain slope and functions as a bridge. Although the mobile boarding bridge has a large volume, it is actually a rather simple tool, and its operation is not so complicated. Let's take a look at how to operate the mobile boarding bridge?
一、移動式登車橋每臺上面都會配備有一份使用說明書,用戶朋友在使用前,要對它進(jìn)行詳細(xì)的閱讀;
1、 Each mobile boarding bridge will be equipped with a user manual. Users should read it carefully before using it;
二、要特別注意移動式登車橋一定要在平坦堅(jiān)實(shí)的地面上工作;
2、 Pay special attention to that the mobile boarding bridge must work on a flat and solid ground;
三、如果要移動此設(shè)備,將接地連接板先收起,調(diào)節(jié)支撐架及可調(diào)節(jié)支撐腿要回收離開地面,用叉車或其他設(shè)備抬起接地連接板一端前移,在移動輪的作用下可以輕松移動到所需的位置;
3、 If the equipment is to be moved, the grounding connecting plate shall be put away first, the adjusting support frame and adjustable support legs shall be recovered from the ground, and one end of the grounding connecting plate shall be lifted by a forklift or other equipment and moved forward, so that it can be easily moved to the required position under the action of the mobile wheel;
四、在使用前先用搖把調(diào)節(jié)好調(diào)節(jié)支撐架,保證登車橋臺面與車廂地面在同一水平面內(nèi),然后將唇板和車廂吻合成一體;
4、 Before use, adjust the adjustment support frame with a crank to ensure that the platform of the boarding bridge is in the same horizontal plane with the floor of the car, and then integrate the lip and the car;

五、松開每個可調(diào)節(jié)支撐腿的鎖緊螺母,將每個可調(diào)支撐腿調(diào)到接觸地面并稍微受力為止,保證各個可調(diào)支撐腿及調(diào)節(jié)支撐腿均衡受力,不能讓調(diào)節(jié)支撐腿離開地面,然后鎖緊各個調(diào)節(jié)支撐腿的鎖緊螺母;
5、 Loosen the lock nuts of each adjustable support leg, adjust each adjustable support leg to contact the ground and bear a slight force, ensure that each adjustable support leg and adjustable support leg bear a balanced force, do not let the adjustable support leg leave the ground, and then lock the lock nuts of each adjustable support leg;
六、將掛鉤掛住集裝箱或車廂可以掛住的受力之處,保證鏈條受力。避免登車橋與車廂放生相對移位或滑動;
6、 Hang the hook to the force bearing place where the container or carriage can be hung to ensure that the chain is stressed. Avoid relative displacement or sliding between the boarding bridge and the carriage release;
七、放下尾板連接板保證連接板與地面無高度差,實(shí)現(xiàn)無臺階式直接登車橋作業(yè)。這時,登車橋準(zhǔn)備好,就可以開始作業(yè)了。
7、 Put down the connecting plate of the tailboard to ensure that there is no height difference between the connecting plate and the ground, and realize the step free direct boarding bridge operation. At this time, the boarding bridge is ready, and the work can start.
以上就是為大家介紹的有關(guān)移動登車橋的詳細(xì)的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://shyulang.cn
The above is a detailed introduction to the mobile boarding bridge, and I hope it will be helpful to you. If you have any questions, please contact us. We will provide services for you with our attitude http://shyulang.cn
?