固定式登車橋安裝坑位要預(yù)留多大?
一直發(fā)揮著很大的作用,給人們的裝卸貨提供了非常大的便利性,然后,它需要安裝在固定作業(yè)場(chǎng)合的貨臺(tái)上面,比移動(dòng)式液壓登車橋多了一個(gè)安裝的過程,那關(guān)于固定式液壓登車橋安裝坑位要預(yù)留多大?
It has been playing a great role in providing great convenience for people's loading and unloading. Then, it needs to be installed on the cargo platform in fixed operation occasions, which has an installation process more than that of mobile hydraulic boarding bridge. How large should the installation pit of fixed hydraulic boarding bridge be reserved?
由于固定式登車橋有需要定做和不需要定做兩種形式,很多固定場(chǎng)合都是不需要定制的,如果登車橋的尺寸是:2440*1830mm,需要預(yù)留的坑位是2600*1860*510mm,只要按照廠家這種標(biāo)準(zhǔn)型尺寸預(yù)留就可以了,然而,有的作業(yè)場(chǎng)合、環(huán)境不同,需要重新根據(jù)現(xiàn)場(chǎng)要求進(jìn)行定制才行,這個(gè)時(shí)候就需要廠家技術(shù)人員現(xiàn)場(chǎng)勘察,然后設(shè)計(jì)登車橋圖紙,才能確定預(yù)留的坑位大小。
Because the fixed boarding bridge has two forms that need to be customized and do not need to be customized, many fixed occasions do not need to be customized. If the size of the boarding bridge is 2440 * 1830mm and the pit position to be reserved is 2600 * 1860 * 510mm, it can only be reserved according to the standard size of the manufacturer. However, some operation occasions and environments are different and need to be customized according to the on-site requirements, At this time, the manufacturer's technicians need to conduct on-site investigation, and then design the boarding bridge drawing, so as to determine the size of the reserved pit.
1、根據(jù)登車橋尺寸,先挖好一個(gè)地坑,無地坑是無法安裝的;
1. According to the size of the boarding bridge, dig a pit first. It cannot be installed without a pit;
2、把地坑內(nèi)走線的線路預(yù)留好,在地坑尾部的地方;
2. Reserve the routing line in the pit and place it at the end of the pit;
3、地坑內(nèi)的三角邊都需要用鋼來包邊,把用于固定的錨釘焊接與角鋼的內(nèi)面,然后上面鋪一些沙子,再用混凝土鋪設(shè)一下;
3. The triangular edges in the pit need to be covered with steel. Weld the anchor nails used for fixing with the inner surface of the angle steel, and then lay some sand on it, and then lay it with concrete;
4、將防撞膠塊固定于貨臺(tái)前端登車橋兩側(cè);
4. Fix the anti-collision rubber block on both sides of the boarding bridge at the front end of the cargo platform;
5、檢查下各個(gè)部位是否固定牢固,施工完畢。
5. Check whether all parts are fixed firmly and the construction is completed.
本文的精彩內(nèi)容由移動(dòng)登車橋提供知識(shí)提供,本網(wǎng)站還有很多的精彩內(nèi)容,更多的內(nèi)容您可以點(diǎn)擊進(jìn)入:shyulang.cn我們有專門的客服為您解答問題
The wonderful content of this article is provided by the mobile boarding bridge. There are many wonderful contents on this website. You can click to enter: www.qingfeijixie.com Cn we have special customer service to answer your questions
產(chǎn)品
資訊
- 2023-07-19 升降貨梯的控制開關(guān)怎么裝線
- 2023-06-29 電動(dòng)液壓貨梯使用特點(diǎn)
- 2023-06-27 升降機(jī)的生產(chǎn)標(biāo)準(zhǔn)有哪些?
- 2023-06-21 升降機(jī)的用途和應(yīng)用范疇有哪些?
- 2023-06-19 液壓升降機(jī)的使用維護(hù)方式
- 2023-06-13 導(dǎo)軌式升降平臺(tái)有哪些使用功能?
- 2023-06-10 導(dǎo)軌式升降機(jī)的裝置及使用
- 2023-06-08 家用別墅電梯的使用指南曳引式電梯